logo

k-deck aluminium slab formwork with Early Stripping Drop Head

FREE SHIPPING

Offer price breaks when you order a larger quantify.

Leading time would be depends on our work efficiency and delivery schedule, usually within 2 business days.

Shipping: Ships in 2 business day

Workstation

The tool workbench is made of aluminum profiles as raw materials, using a variety of aluminum profiles, cutting precision, It is easy to process, and the surface is not rusty. It can be combined with various materials and accessories to assemble into various Various styles of workbenches are beautiful and portable, easy to disassemble and assemble, flexible to adjust, and can be customized on demand.

It does not require maintenance and is widely used in various industrial production industries.


safety & guarding

Aluminum profile small shield Product classification: Industrial fence/protection case The whole is made of aluminum profile 4040 and frosted pc board. The overall appearance is beautiful and atmospheric, relatively stable, and the size can be customized according to requirements


Machine Enclosure Machine Frame

The automobile inspection fixture frame is assembled with aluminum profiles and accessories, and the product is designed according to customer requirements Appropriate frame structure, using heavy-duty profiles and supporting connectors, beautiful products , Atmosphere, high strength, please consult APS online customer service for details


Airodek - RMD

A quick strip system_ where the panels and deck beams are removed during the early stages of curing_ whilst the dropheads and shoring remain undisturbed to support the concrete· Airodek A lightweight_ versatile soffit formwork system· PRODUCT BROCHURE 2

Scaffolding and Formwork panel systems Aluminum slab panels

Scaffolding and Formwork panel systems Aluminum… Scaffolding and Formwork panel systems Aluminum slab panels ! Brand! Cmax! Article No! 3CFS0218143! Supplier ID ! A01!

Gulf Construction Online - Meva systems help Iranian

The slabs are poured using the MevaDec slab formwork applying the drop-head-beam-panel method, The drop head allows for early stripping, that is the props remain under the poured slabs while the panels and beams can be removed early for the next slab, Thus the site needs two sets of props but only one set of panels and beams to do all the slab ,,,

Qingdao Hilong Machinery Co., Ltd. -

Aluminum Framed ALU-RAS Concrete Wall Formwork Panels ,,, 130,0 / Piece, 00-09, Early Stripping Concrete Slab Panel Formwork K deck System ,,, k-deck aluminium slab ,,,

non groupé , - Qingdao Hilong Machinery Co., Ltd. - //french

k-deck aluminium slab formwork with Early Stripping Drop Head Prix de Fob| US $ 100.0-100.0 /Morceau Quantité d'.'.ordre minimum| 400 Morceau/Morceaux

TITAN HV slab formwork system - Friedr. Ischebeck

TITAN HV slab formwork system, The following features distinguish our aluminium beam system· Economic· main and secondary beams lie in the same plane and can be moved as required to form an interlocking grid. Drop-head allows early striking· all beams and/or panels can be released. Erecting and striking from below means a high level of safety.

K-Stage Slab & Access Archives - KHK Scaffolding & Formwork

WINSTON SCAFFOLDING PTY LTD. AUSTRALIA. 44|46 Gould Street, South N.S.W. 2136. Tel: 0061|29758 8700 Fax: 0061|297587263

Good Formwork for Homes| Concrete Construction

The slabs are poured using the MevaDec slab formwork and applying the drop-head-beam-panel method. The drop head allows for early stripping; the props remain under the poured slabs while the panels and beams can be removed early for the next slab. Thus the site needs two sets of props but only one set of panels and beams to do the entire slab jobs.

How KITSEN Aluminum Formworks Installed

Set position steel bars_ Use steel bars welded on the vertical steel bars of the wall /column as the positioning point when installing, the height is 40-60mm from the floor, and the spacing does not exceed 800mm, the internal corner position must ensure at least one positioning bar in each direction, The length of the positioning steel bar shall be equal to or smaller than the cross section of !!!